Close
Contact us
Help
Register
Login
Search
Advanced search
Ulrich von Eitzen and Harald Fassmer
GP02FZH
Completed
★★★★
Deselect all
Deselect all
Select all
Invert Selection
Download
1 item
Go to Login page
Linked assets
Folder
Rainbow Warrior III Construction
GP02FYY
GP02FYY
★★★★
Package
The New Rainbow Warrior
GP0ALB7
GP0ALB7
ReadyForCataloguing
★★★★★★
Package
Rainbow Warrior III Construction (Photos & Videos)
GP0ALB17
GP0ALB17
★★★★
Package
Rainbow Warrior III (Photos & Video)
GP028JB
GP028JB
ReadyForCataloguing
★★★★★★
View all
Ulrich von Eitzen and Harald Fassmer
Ulrich von Eitzen International Project Coordinator Rainbow Warrior III (right) and Harald Fassmer, General Management Fassmer Werft (left)
The new Greenpeace flagship the Rainbow Warrior III enters the water at the Fassmer Shipyard in Berne, before the addition of masts and other essential finishing touches. The Rainbow Warrior is Greenpeace's first purpose-built vessel, and will be officially launched in Autumn 2011.
Creator:
Marcus Meyer
Unique identifier:
GP02FZH
Old Image ID:
MM_Greenpeace_Rainbow-Warrior 3_Stapellauf_MG_3629
Type:
Image
Ranking:
★★★★
Size:
4096px × 2731px 832KB
Keywords
Keywords:
Construction
-
Construction sites
-
Day
-
Greenpeace logo
-
Greenpeace staff
-
KWCI (GPI)
-
Men
-
MY Rainbow Warrior III
-
Outdoors
-
Portraits
-
Shipyards
-
Two people