Close
Contact us
Help
Register
Login
Search
Advanced search
Direct Action at Batang Coal Power Plant Project in Indonesia - News Access (Indonesian with Subs)
GP0STQNTD
Completed
★★★★
Deselect all
Deselect all
Select all
Invert Selection
Download
1 item
Go to Login page
Your browser does not support this video.
Direct Action at Batang Coal Power Plant Project in Indonesia - News Access (Indonesian with Subs)
12 activists from the Break Free Coalition, consisting of Greenpeace, WALHI and JATAM, occupy the piling barges which operate in East Roban waters, Batang Regency, Central Java. The activists unfurl a big banner that calls for the termination of the construction of the coal fired power plant. A flotilla with local fishermen boats join the action.
Unique identifier:
GP0STQNTD
Old Image ID:
STOP PLTU BATANG_Indonesia_SUBS.mp4
Type:
Video
Ranking:
★★★★
Duration:
1m0s
Size:
1920px × 1080px 92MB
Keywords
Keywords:
Actions and protests
-
Climate (campaign title)
-
Climbing actions
-
Coal-fired power stations
-
Day
-
Greenpeace activists
-
Industrial cranes
-
KWCI (GPI)
-
Outdoors